The surface itself just has to be strong enough to handle your weight along with tools and gear.
Attic walkway plywood.
Once the boards are in place place more screws placed 16 inches 40 64 cm apart to hold the plywood to the subfloor frame.
1 2 plywood or osb should be enough in my non pro opinion.
If you plan to finish the floor in the attic and turn the room into a living space however you should always use 3 4 inch.
After that screw it in place using the 2 inch deck screws.
The plywood should be laying on top of the subfloor with no overhang.
Plywood is lighter to carry which is good.
We normally recommend that you place plywood over the top of the rafters creating a walkway to the a c and in that area only lay in one or two layers of unfaced fiberglass blanket on top of the plywood walkway and around the ac unit itself.
Place the first plywood sheet on top of the 2x structure starting by the attic entrance.
Apply construction adhesive on one side and place it on the horizontal chord.
I would not feel right about walking on the fiberglass but for all i know it could be ok.
We used leftover plywood scraps to build ours an attic walkway also needs enough support.
Once you re done laying down all of the plywood your attic floor is finished.
No matter what the spacing is on your ceiling joists 3 4 inch plywood should be used if you plan on walking on it.
If you plan on placing the plywood around the perimeter of the opening or door and using it only to store light boxes or materials 1 2 inch thick plywood should suffice.
Some people extend the wood up on 2x2s across the rafters to clear insulation but care would be needed to prevent that from slipping.
Ensure that the end of the first plywood sheet lands on a piece of 2x leaving enough room to position the.
A 4 foot long plywood strip will need at least 8 screws on it.
The thinner plywood is acceptable when the joist spacing is 16 inches.
Continue the process until the flooring is finished.
An attic walkway doesn t have to be pretty or expensive.